Stainless Steel Piping Systems Expert

Beijing Daxing International Airport


Beijing Daxing International Airport is located at the border of Daxing District, Beijing, and Langfang, Hebei Province. It is a 4F-class international airport and a major international aviation hub. The project covers a total area of approximately 780,000 square meters. Its piping system uses Franta S304 stainless steel piping products with a combination of double press-fit and grooved connections, providing a reliable piping foundation for the long-term and stable operation of this large transportation hub. Project Type: Public Building Project / International Airport / Integrated Transportation Hub Project Location: Beijing, China Application scenarios: Airport Building Water Supply Piping System Solution: Franta Stainless Steel Piping System Solution for Public Building Projects Product used: Stainless Steel Pipes, Double Press-Fit Fittings, Grooved Fittings, and Related Piping Products Service Support: Product Supply, Technical Coordination, Installation Support, Project Services, and After-Sales Support

Project Background

Large international airports are characterized by extensive building areas, multiple functional zones, concentrated passenger flows, complex MEP systems, and continuous long-term operation. These characteristics place high requirements on the stability, installation efficiency, and long-term maintenance of building piping systems.

Beijing Daxing International Airport covers a total area of approximately 780,000 square meters. As a major international aviation hub, it includes passenger service areas, commercial spaces, offices, equipment areas, and various other functional zones. Its piping network covers a wide area with numerous branches and must support the high-intensity operating environment of a large public building over the long term.

For a major transportation hub of this scale, a large proportion of the piping is installed within pipe shafts, ceilings, equipment areas, and other concealed spaces. Once the airport begins operation, any piping problem may be difficult to repair and could affect a wide range of areas. Product quality, connection reliability, and long-term system durability are therefore especially important during the initial project stage.

Key Project Requirements and Challenges

Large Building Scale and Extensive Piping Coverage

Large airports contain numerous functional areas, with long piping distances and complex branch networks. The system therefore requires strong overall coordination and reliable long-term operation.

Continuous Long-Term Operation Requires High System Reliability

Airports are important public infrastructure facilities that operate continuously over long periods. Any failure in the piping system may affect the normal operation of related areas, placing higher requirements on pipe quality and connection stability.

Complex MEP Systems Require Extensive Construction Coordination

Airport projects involve water supply and drainage, fire protection, HVAC, electrical systems, and extensive equipment piping. With significant multi-trade coordination requirements, the piping system needs to combine standardized installation, construction efficiency, and adaptability to complex on-site spaces.

Different Main and Branch Pipe Sizes Require Integrated Connections

Large public building projects typically include main pipelines and branch lines of different sizes. Suitable connection methods need to be selected according to pipe diameter and installation location to create a complete and coordinated piping network across different areas.

Franta Solution

Based on the application requirements of Beijing Daxing International Airport as a large public building, the project adopted Franta S304 stainless steel piping products with a combination of double press-fit and grooved connections to meet piping installation requirements across different pipe diameters and building areas.

S304 Stainless Steel Piping System

The project uses S304 stainless steel pipes, providing corrosion resistance, pipe strength, and long-term stability to create a reliable piping foundation for this large transportation hub.

Double Press-Fit Connections for Small- and Medium-Diameter Pipes

Small- and medium-diameter pipelines use double press-fit connections installed with standardized tools and matching fittings. This helps reduce complex on-site connection procedures and better accommodates the large number of branch lines and connection points within the airport project.

Grooved Connections for Larger-Diameter Pipes

Larger-diameter main pipelines and corresponding piping sections use grooved connections in combination with the double press-fit system, creating an integrated connection solution for pipes of different sizes.

Integrated Products and Project Services

Stainless steel pipes, press-fit fittings, grooved fittings, and related piping products are supplied as an integrated system. Combined with product supply, technical coordination, and installation support, this provides support for successful implementation of the project piping system.

Project Value

Stable and Durable

The S304 stainless steel piping system supports the long-term and continuous operating requirements of large public buildings.

Reliable Connections

Double press-fit and grooved connections are matched to different pipe sizes and installation locations, creating a more complete system connection solution.

Efficient Installation

Standardized connection methods help reduce complex on-site procedures and better accommodate the multi-trade construction environment of a large international airport.

System Adaptability

By combining different connection methods, the piping system can meet configuration requirements for main pipelines, branch lines, and different functional areas throughout the transportation hub.

Service Support

From product supply and technical coordination to installation support and subsequent services, Franta provides support for successful piping system implementation and long-term operation in large public building projects.

Previous page

Next page

Previous page

Next page

Application products

Application Products

Project service support

Project Implementation and Service Support

During project execution, Forte not only focuses on product delivery itself but also places great emphasis on engineering coordination and service responsiveness. In response to the demands of commercial real estate projects for both engineering efficiency and delivery quality, our service support can be structured around the following areas:

01

Initial proposal communication

Provide product selection and system integration recommendations tailored to the project’s application scenarios.

02

Mid-term supply coordination

Coordinate with the project timeline to advance document verification, product procurement, and on-site coordination.

04

Installation process supported

We provide installation coordination, construction support, and issue‑resolution assistance tailored to your specific needs.

04

After-sales service and support

Provide ongoing after-sales support to ensure the smooth operation and effective use of the project following delivery.